| Note:
Townline/Beach Ridge-Feigle/East Canal/Tonawanda Creek. Some moderate patches of fog, but not too bad. The Beach Ridge Road sewer construction isn't quite done and is still technically closed for a short stretch. There's ground up pavement, but one lane was still open as I expected when I took the chance. Also dropped a bottle early in my ride this morning and had to go back to pick that up. DOH! |